{"id":55583,"date":"2021-08-05T15:46:48","date_gmt":"2021-08-05T14:46:48","guid":{"rendered":"https:\/\/www.intelligentcio.com\/eu\/?p=55583"},"modified":"2021-08-11T10:27:01","modified_gmt":"2021-08-11T09:27:01","slug":"successful-expansion-at-green-mountains-data-centre-site-in-oslo-region","status":"publish","type":"post","link":"https:\/\/www.intelligentcio.com\/eu\/2021\/08\/05\/successful-expansion-at-green-mountains-data-centre-site-in-oslo-region\/","title":{"rendered":"Successful expansion at Green Mountain\u2019s data centre site in Oslo region"},"content":{"rendered":"\n<p>Only nine months after the opening of the DC3-Oslo data centre, the site expands with an additional 4MW building. This second building is a built-to-suit project for a large international cloud provider and was delivered ahead of schedule despite the challenges posed by Covid-19.<\/p>\n\n\n\n<p>The data centre expansion consists of a new 4 MW data centre building, doubling the current capacity at the site. It also includes new back-up generator sets and associated infrastructure. The total timeline was estimated at nine months and numerous sub-contractors and vendors were involved in the project.<\/p>\n\n\n\n<p>\u201cThe project progressed nicely although the Covid-19 situation posed challenges with for instance equipment deliveries. However, we managed to find alternative solutions and actually completed the project a few days ahead of schedule,\u201d said Project Manager, H\u00e5vard Lur\u00e5s.<\/p>\n\n\n\n<p>CEO of Green Mountain, Tor Kristian Gyland, said that the massive interest in this site will result in several new expansions in the near future. \u201cNorway\u2019s abundance of low-cost renewable power, the government\u2019s beneficial framework conditions and Green Mountain\u2019s ability to deliver sustainable and high-quality data centres at a rapid speed to market make a strong value proposition. We have secured power and land to grow this site for several years to come.\u201d<\/p>\n\n\n\n<p>The DC3-Oslo site is perfectly situated in terms of power supply, infrastructure and connectivity, only 20 km from downtown Oslo. It is Green Mountain\u2019s third data centre site in addition to its mountain hall facility outside Stavanger and the facility at Rjukan, Telemark. \u201cWe expect to grow at all our three existing locations, but we also need to expand in other regions. We have already secured land at two different locations on the Norwegian west coast, at Kalberg and Haugaland Business Park.\u201d<\/p>\n\n\n\n<p>Data centres are the backbones of the modern digital society and consequently the demand will surge. &#8220;A recent Altman Solon report shows that the Nordics will take up a disproportionate share of the expected growth in Europe, so I am very optimistic about the future,\u201d said Gyland.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Only nine months after the opening of the DC3-Oslo data centre, the site expands with an additional 4MW building. This second building is a built-to-suit project for a large international cloud provider and was delivered ahead of schedule despite the challenges posed by Covid-19. The data centre expansion consists of a new 4 MW data [&hellip;]<\/p>\n","protected":false},"author":40,"featured_media":55584,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[55,13,476,93,24],"tags":[112,16329,9907,10152,858],"class_list":["post-55583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-centres","category-main-story-newsletter","category-nordic","category-top-stories","category-used","tag-data-centre","tag-dc3-oslo-data-centre","tag-green-mountain","tag-nordics","tag-oslo"],"acf":[],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/posts\/55583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/comments?post=55583"}],"version-history":[{"count":3,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/posts\/55583\/revisions"}],"predecessor-version":[{"id":55740,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/posts\/55583\/revisions\/55740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/media\/55584"}],"wp:attachment":[{"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/media?parent=55583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/categories?post=55583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.intelligentcio.com\/eu\/wp-json\/wp\/v2\/tags?post=55583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}