{"id":36900,"date":"2024-05-02T15:46:27","date_gmt":"2024-05-02T14:46:27","guid":{"rendered":"https:\/\/www.intelligentcio.com\/north-america\/2024\/05\/02\/northern-data-groups-colocation-provider-breaks-ground-on-upgrade-to-pittsburgh-data-centre\/"},"modified":"2024-05-15T10:26:54","modified_gmt":"2024-05-15T09:26:54","slug":"northern-data-groups-colocation-provider-breaks-ground-on-upgrade-to-pittsburgh-data-centre","status":"publish","type":"post","link":"https:\/\/www.intelligentcio.com\/north-america\/2024\/05\/02\/northern-data-groups-colocation-provider-breaks-ground-on-upgrade-to-pittsburgh-data-centre\/","title":{"rendered":"Northern Data Group&#8217;s colocation provider breaks ground on upgrade to Pittsburgh data centre"},"content":{"rendered":"\n<p>Northern Data Group&#8217;s cutting-edge colocation provider, Ardent Data Centers, has announced it has broken ground on construction at its&nbsp;Pittsburgh, Pennsylvania&nbsp;data centre site, following its&nbsp;acquisition&nbsp;in&nbsp;January 2024.<\/p>\n\n\n\n<p>The site is being retrofitted into a cutting-edge, high-density data centre environment, purpose-built to power the next generation of High-Performance Computing.<\/p>\n\n\n\n<p>With the engineering review complete, the upgrade of the 7.5-acre site has begun; retrofitting the 41,000 square-foot building with the latest liquid cooling technology to allow for additional power and maximised energy capacity.&nbsp;<\/p>\n\n\n\n<p>Pittsburgh&nbsp;is strategically located with access to the entire Eastern Seaboard, with under 10ms latency to major US eastern hubs.<\/p>\n\n\n\n<p>The upgrade is due to complete by Q4 2024. The site will have an immediate capacity of 5MW, with plans to upgrade to 20MW in the future.<\/p>\n\n\n\n<p>Pittsburgh&nbsp;is a favourable location to support Ardent Data Center&#8217;s expansion, with supportive local stakeholders. It also has access to an abundance of clean energy from hydroelectric and wind sources. This is aligned to Ardent Data Center&#8217;s long-term strategy as it continues to pioneer efficient data centre environments that give data-intensive organisations optimized performance and availability in the most sustainable way. &nbsp;<\/p>\n\n\n\n<p>This site will be the latest advancement of Northern Data Group&#8217;s strategy to expand Ardent Data Center&#8217;s global footprint and bring high-density, liquid cooled solutions to the market, providing colocation services for compute power across&nbsp;the US&nbsp;and&nbsp;Europe.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Northern Data Group&#8217;s cutting-edge colocation provider, Ardent Data Centers, has announced it has broken ground on construction at its&nbsp;Pittsburgh, Pennsylvania&nbsp;data centre site, following its&nbsp;acquisition&nbsp;in&nbsp;January 2024. The site is being retrofitted into a cutting-edge, high-density data centre environment, purpose-built to power the next generation of High-Performance Computing. With the engineering review complete, the upgrade of the [&hellip;]<\/p>\n","protected":false},"author":50,"featured_media":36902,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1034,513,43,514],"tags":[6136,991,102,6137,5831,2867,5607,6138],"class_list":["post-36900","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-north-america","category-regional-news-newsletter","category-top-stories","category-used","tag-ardent-data-centers","tag-colocation","tag-data-centre","tag-high-performance-computing","tag-hpc","tag-liquid-cooling","tag-northern-data-group","tag-pittsburgh"],"acf":[],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/posts\/36900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/comments?post=36900"}],"version-history":[{"count":2,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/posts\/36900\/revisions"}],"predecessor-version":[{"id":37146,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/posts\/36900\/revisions\/37146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/media\/36902"}],"wp:attachment":[{"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/media?parent=36900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/categories?post=36900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.intelligentcio.com\/north-america\/wp-json\/wp\/v2\/tags?post=36900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}